Neutron (NTRN) Calendar: Release Schedule, Listings, Hard Fork, Halving
Neutron Testnet Shutdown
Neutron will deprecate Neutron Testnet at the end of the current maintenance period on June 30th.
NTRN Redemption Claims
Neutron will open claims for the voluntary NTRN redemption as early as May 1st at 12:00 UTC.
NTRN Redemption
Neutron opened NTRN Redemption on April 1st. Holders can burn liquid NTRN in exchange for a pro-rata share of the 1,387,453.67 USDC pool.
Resumption of Orderbook and Supervault Operations
Neutron reports that a whitehat identified a vulnerability through its bug bounty program. No funds were affected.
Partnership With Wrapped Bitcoin
Wrapped Bitcoin (WBTC) has announced an upcoming collaboration with Neutron, a finance-focused blockchain platform.
Mercury Upgrade
Neutron has announced Mercury Upgrade, the network’s most significant update yet.
Network Upgrade
Neutron will undergo a scheduled network upgrade to version 5.1 at block height 19947000, expected to occur around 2 PM UTC on February 12th.
AMA on Telegram
Neutron will host an AMA Telegram on November 28th at 10:30 AM UTC to discuss the latest ecosystem developments.
Network Upgrade
Neutron will undergo a scheduled upgrade to v.5.0 of its network protocol on November 14th, at 10:00 AM UTC, corresponding to block height 16,738,000.
Dubai Meetup
Neutron, in collaboration with Valence, will host an event called “Newt Beach” in Dubai on October 24th.
Amulet Launch
Neutron has launched a new feature on its platform. This feature allows for self-repaying, liquidation-free loans on cross-chain staked assets.
Network Upgrade
Neutron has announced a scheduled upgrade that is set to occur at block height 13711950. The upgrade is expected to take place around August 21st at 22:30 UTC.
Slinky Integration
Neutron is set to integrate Mars Protocol, an app on its platform, with the Slinky oracle of the Skip Protocol.
Neutron v.4.0 Upgrade
Neutron has announced that the proposal for the v.4.0 upgrade has been successfully approved.
Lockdrop Conclusion
Neutron is set to conclude its lockdrop for USDC.axl — NTRN and ATOM — NTRN pools on Astroport on May 30th.
Network Upgrade
The Neutron’s network upgrade will take place at the block height of 10,525,000, or on May 23rd at 14:30 (UTC).



