Follow
Show Coin Info
Price
0.01764885 USD
% Change
6.56%
Market Cap
14.8M USD
Volume
23.4K USD
Circulating Supply
844M
421% from all time low
425% to all time high
126% from all time low
-36% to all time high
84% are in circulation
Circulating Supply
844,043,746
Max Supply
1,000,000,000

Blood Crystal to Conduct Scheduled Maintenance on August 19th

8
Source
Add to Calendar
Share
28

Blood Crystal will host a scheduled system maintenance intended to upgrade security and stability, set for August 19th from 04:00 to 05:00 UTC. During this interval, services may be temporarily unavailable.

Event date: August 19, 2025 4:00 UTC
Eternal Crypt - Wizardry BC - | ECWiz
@wizardrybc_en
Notice of Maintenance🚨
We will undergo scheduled maintenance for a system upgrade to enhance security and stability during the following period.

【Maintenance Duration(JST)】
august 19th (tue), 01:00 p.m. to 02:00 p.m. (scheduled)
*Please note that the end time is subject to
The event is about to begin
0
D
0
H
0
M
0
S
A
Added by Alika
Aug 18 09:43 (UTC)
2017-2025 Coindar