Follow
Show Coin Info
Market Cap
3460B USD
Volume
204B USD

Deutsche Telekom and Bankhaus Metzler Launch Pilot Project for Bitcoin Mining With Surplus Energy

8
Source
Add to Calendar
Share
43

Deutsche Telekom subsidiary Telekom MMS, in partnership with Bankhaus Metzler, has initiated a pilot project named “Digital Monetary Photosynthesis” to test Bitcoin mining infrastructure powered by surplus renewable energy. Hosted by Metis Solutions GmbH at RIVA Engineering GmbH’s facilities in Backnang, Germany, the project aims to use excess energy that would otherwise go unused due to grid limitations. By converting surplus power into digital assets, the project seeks to stabilize the energy grid and support renewable energy producers facing unpredictable energy output.

The initiative aligns with global practices, as similar models have been tested in the USA and Finland. The project explores Bitcoin mining’s potential as a flexible load solution to balance energy supply and demand. With insights gained, Telekom MMS and Bankhaus Metzler intend to explore further applications of digital assets in the German market.

Event date: November 4, 2024 UTC
The event is about to begin
0
D
0
H
0
M
0
S
A
Added by Alika
2017-2024 Coindar