Follow
Show Coin Info
IERC-20 to Upgrade Mining System on January 18th
IERC-20 is set to implement two significant upgrades on January 18th. The first upgrade will affect DPoS miners, as the minimum required DPoS points per mine will be increased to 1,000. This change is expected to impact the mining process and the overall efficiency of the network.
The second upgrade is an optimization of the PoW difficulty in the reward program. The PoW difficulty weight will be reduced from 10 square x to 5 square x. This adjustment aims to narrow the gap between high and low computational power, providing more opportunities for PoW miners with lower power.
Event date: January 18, 2024 UTC
🔧Update Alert: Two major upgrades coming in the next 2 hours!
Minimum DPoS point consumption: For all DPoS miners, the minimum required DPoS points per mine will then be 1,000.
Optimization of PoW difficulty in the reward program: PoW difficulty weight is decreasing from 10 square "x" to 5 square "x", narrowing the gap between high and low computational power, and offering more opportunities for PoW low-power miners.
Minimum DPoS point consumption: For all DPoS miners, the minimum required DPoS points per mine will then be 1,000.
Optimization of PoW difficulty in the reward program: PoW difficulty weight is decreasing from 10 square "x" to 5 square "x", narrowing the gap between high and low computational power, and offering more opportunities for PoW low-power miners.
The event is about to begin
0
D
0
H
0
M
0
S
A
Added by
Alika
✕
✕